×

INDI Library v1.9.9 Released (30 Nov 2022)

Bi-monthly INDI Library released with new drivers and bug fixes.

Scheduler question

  • Posts: 59
  • Thank you received: 3
Is it possible to have the scheduler configured to interrupt a sequence when a higher priority sequence becomes runnable? For example, if my primary target isn't visible until a certain time / elevation, I typically want to image something else before then, but as soon as possible I want to start on the primary target. If I set the primary sequence to a priority of 20 and the filler sequence as a priority of 10, the scheduler shows that it will run the filler sequence to completion before starting the higher priority sequence. I have to decrease the number of images to get the primary job to start as soon as it meets the criteria to start (at least I have to do this according to the sequence info in the list for start times).
2 years 6 months ago #54651

Please Log in or Create an account to join the conversation.

Time to create page: 0.230 seconds