the time proposed by the scheduler are confusing for me. I explain. I done a mosaic of 3x3 pictures. for each capture, i do 20 shoot of 30 secondes.
the complete sequence need 2 nights (i suppose) to be accomplished. When i look the start time of the each job, i see that a job start a 12:39 am and other that start after 12 am also. But when is it ? I'm lost on the time proposal by the scheduler. May be because is not natural time in french (we use time on 24h).