It would be really helpful to have the option to pre-cool the camera before all the Sequence steps, probably as a feature on the Observatory Start-Up procedure, just like the Warm CCD on the Observatory Shutdown Procedure.
1. Unpark Dome
2. Unpark Mount
3. Unpark Cap
4. Cool the camera at the specified value, when reached proceed to the 1st sequence.
(The 4 could be 1 too, but it would be easier for the cooler to drop the temp after the dome is open, not while is closed.)
The T option in the Capture module - while on Scheduler - sets the temperature after the track, focus, align, and guide steps.